Base construction of buildings
Base construction or ‘base build’ refers to the works done, usually by speculative office building developers, to erect the ‘basic’ elements of a buildings. Once the building is let to tenants they are then given responsibility or the fit out of the interior, that is, making interior spaces suitable for occupation.
‘Base build’ may also be referred to as ‘shell and core’, and typically includes:
- Primary structure.
- Building envelope (roof and façade) in whole or part.
- Mechanical and supply systems (electricity, HVAC, telephone, water, drainage, gas, etc.,), up to the point of contact with individual tenant spaces.
- Public circulation and fire egress areas, such as lobbies, corridors, elevators and public stairs.
Once practical completion of the base build has been finished, the tenant fits out their part of the lettable space. Tenants may be given access prior to practical completion to carry out parts of the works, and may be allowed a rent-free period for the duration of fit out works.
The agreement to lease between landlord and tenant should clearly define who does what, to what standard, and the periods allowed, including:
- What comprises the base build, including space provision in common areas for tenant equipment such as standby generators, extra chillers, or uninterrupted power supply plant.
- What elements of the fit out may be installed by the tenant but funded by the developer/landlord.
- What tenant equipment is to be installed in common areas.
When the tenant takes occupation of the space, it is wise to undertake a conditions survey so that they can notify the developer or landlord of any defects or omissions. It is relatively common that defects in the base construction do not get rectified by the contractors quickly enough for the fit out to be completed. This can lead to the tenant’s contractors making good the defects and then issuing a claim to the base build contractors for the cost of the works.
For more information see: Shell and core.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.